Wednesday, May 18, 2011

Corps to rebuild Birds Point levee

The Army Corps of Engineers says that the Birds Point-New Madrid spillway levee will be restored.

In a letter to Representative Jo Ann Emerson (R-MO), the Assistant Secretary of the Army for Civil Works, Jo-Ellen Darcy, established a timeline for rebuilding the levee system.

In the letter, Darcy said that water should recede within 40 to 60 days without further rainfall. The land will need another 21 to 30 day to dry. After the drying out period, the Corps would make an assessment to determine the extent of restoration.

Representative Emerson called the Birds Point operation, “a deeply painful experience for thousands of people.” She says that the Corps’ commitment to rebuild is the first good news about the levee in a long time.

0 comments:

Post a Comment